FeNerve Building
 
Pre Engineering Steel Building
Pre ConstructionPoly Corbonate Sheet
 

Construction

Scheduling

Drawing up a timetable for the completion of various stages of a complex project. Also, the coordination of multiple related tasks into a single time sequence.

Quality Control

The basic goal of quality control is to ensure that the products, services, or processes provided meet specific requirements and are dependable.

Safety Mangement

A safe site requires the effective planning of work operations, and project personnel with technical competence, and positive attitudes towards safety.

Subcontractor Management

The work that remains is performed by subcontractors, who are under contract to the contractor, who is usually designated the general or prime contractor.

Status Reporting

A status report is a report that summarizes a particular situation as of a stated period of time.

Steel Erection

Steel erection is the construction, alteration or repair of steel buildings, used during the process of erection.

Window and Door Installation

Finding the right window contractor will ensure that you get the most energy efficient windows available for your budget.

 